Questions and published explanations below are available without starting a test. Some questions may not have a published solution yet.
0 / 27 published solutions
Question 135 MSQ · 1.0 marks
scikit-network package contains functions for (pick all correct sentences):
A.
analysis of faults in a computer network
B.
social network analysis
C.
analysis of large graphs
D.
enhancing one’s social network
**BDM**
**Section Id :** 64065329421
**Section Number :** 5
**Section type :** Online
**Mandatory or Optional :** Mandatory
**Number of Questions :** 21
**Number of Questions to be attempted :** 21
**Section Marks :** 40
**Display Number Panel :** Yes
**Group All Questions :** No
**Enable Mark as Answered Mark for Review and**
Yes
**Clear Response :**
**Maximum Instruction Time :** 0
A published solution is not available for this question yet.
The figure represents a bubble chart for mobiles, where X-axis represents the Volumes, Y-axis
represents the Revenues, and the size of the bubble represents the average days of inventory.
Select the option/s that is/are wrong:
A.
Reduce the inventory for the SKU with 24 as average days of inventory
B.
Increase the inventory for the SKU with 24 as average days of inventory
C.
SKU with 24 is an Outlier and hence remove it from analysis.
D.
Both Reduce the inventory for the SKU with 24 as average days of inventory &
SKU with 24 is an Outlier and hence remove it from analysis.
A published solution is not available for this question yet.
Arrange the following steps while working with unstructured data in a ranking modeling:
I. Normalizing
II. Preprocessing
III. Ranking
IV. Composite score
A.
I -> II -> III -> IV
B.
II -> I -> IV -> III
C.
I -> II -> IV -> III
D.
II -> I -> III -> IV
A published solution is not available for this question yet.
Here the factors F1 ..F3 are “higher the better”, but, F4 is “lower the better”. Rank the above
candidates and choose the correct ranking from the below options.
A.
Partha > Akanksha > Siva > Lavanya
B.
Akanksha > Lavanya > Siva> Partha
C.
Partha < Akanksha < Lavanya < Siva
D.
Akanksha < Lavanya < Siva< Partha
A published solution is not available for this question yet.
Answer the given subquestions on the Overall Equipment Effectiveness of fasteners
manufacturing.
**Hint:**
Just in case you forgot the formula
Availability = Run Time / Planned Production Time
Run Time = Planned Production Time − Lost Time
Performance = (Total Count / Run Time) / Ideal Run Rate
Quality = Good Count / Total Count
OEE = Availability × Performance × Quality
A nut manufacturing process had scheduled maintenance of two shifts in a particular week. Which
components(s) of Overall Equipment Effectiveness (OEE) will certainly be affected in that week?
a) availability
b) performance
c) quality
A.
only b
B.
only a
C.
b and c
D.
All of these
E.
None of these
A published solution is not available for this question yet.
Answer the given subquestions on the Overall Equipment Effectiveness of fasteners
manufacturing.
**Hint:**
Just in case you forgot the formula
Availability = Run Time / Planned Production Time
Run Time = Planned Production Time − Lost Time
Performance = (Total Count / Run Time) / Ideal Run Rate
Quality = Good Count / Total Count
OEE = Availability × Performance × Quality
Calculate the following of the Gear Manufacturing Equipment for a particular week
Availability - _______%
A published solution is not available for this question yet.
Answer the given subquestions on the Overall Equipment Effectiveness of fasteners
manufacturing.
**Hint:**
Just in case you forgot the formula
Availability = Run Time / Planned Production Time
Run Time = Planned Production Time − Lost Time
Performance = (Total Count / Run Time) / Ideal Run Rate
Quality = Good Count / Total Count
OEE = Availability × Performance × Quality
Calculate the following of the Gear Manufacturing Equipment for a particular week
Performance ________%
A published solution is not available for this question yet.
Answer the given subquestions on the Overall Equipment Effectiveness of fasteners
manufacturing.
**Hint:**
Just in case you forgot the formula
Availability = Run Time / Planned Production Time
Run Time = Planned Production Time − Lost Time
Performance = (Total Count / Run Time) / Ideal Run Rate
Quality = Good Count / Total Count
OEE = Availability × Performance × Quality
Calculate the following of the Gear Manufacturing Equipment for a particular week
Quality ________%
A published solution is not available for this question yet.
Answer the given subquestions on the Overall Equipment Effectiveness of fasteners
manufacturing.
**Hint:**
Just in case you forgot the formula
Availability = Run Time / Planned Production Time
Run Time = Planned Production Time − Lost Time
Performance = (Total Count / Run Time) / Ideal Run Rate
Quality = Good Count / Total Count
OEE = Availability × Performance × Quality
Calculate the following of the Gear Manufacturing Equipment for a particular week
OEE ________ (Enter a number from 0 to 1 up to 3 decimal places)
A published solution is not available for this question yet.
Answer the given subquestions on the Overall Equipment Effectiveness of fasteners
manufacturing.
**Hint:**
Just in case you forgot the formula
Availability = Run Time / Planned Production Time
Run Time = Planned Production Time − Lost Time
Performance = (Total Count / Run Time) / Ideal Run Rate
Quality = Good Count / Total Count
OEE = Availability × Performance × Quality
An 8-hour shift of clamp manufacturing process (with no downtime) has an OEE of 0.90
performing at its designed speed and produces a total scrap of 45 units. What is the total number
of units produced in the shift?
A published solution is not available for this question yet.