MauryaHub PYQ Practice

Statistics for Data Science II · End Term · Jan 2026 · FN

Statistics for Data Science II · End Term · Jan 2026 FN

← Course papers · Start practice / exam

Questions and published explanations below are available without starting a test. Some questions may not have a published solution yet.

20 / 20 published solutions

Question 2 MCQ · 0.0 marks

Source diagram or notation
Continuous random variables: Distribution PDF (fx(k)) CDP (Fx(z)) E[X] Var(X) 0 a<a F Uniform|a, ] ee ale oe ake arhb (8) b-a b-a 2 12 1 z>b 0 <0 1 1 ome S 1 ny Exp(\) de, 2 >0 _ lt 7 7 —_ (= | Normal(, 0) | oV2n 20? | No closed form LL o -00 << 00 Bt ie es &. Gamma(a, 3) Ta” et r>0 3 BP T(at+8) o4 B-1 Bet or *(1— 2) a ap nae ni a+8 | @+Bpa+etl) 1. Markov’s inequality: Let X be a discrete random variable taking non-negative values with a finite mean y. Then, P(X2e)< lt 2. Chebyshev’s inequality: Let X be a discrete random variable with a finite mean pr and a finite variance o?. Then, 3. Weak Law of Large numbers: Let X;, Xo,..., o. Define sample mean X = P(|X—p|2 ko) < 1 Pe Xit Kote + Xn Then, n x i P(| “MP9s —o X, ~ iid X with E[X] = p, Var(X) = 4, Using CLT to approximate probability: Let X;, X2,...,Xn ~ iid X with E[X] = pt, Var(X) = Cn Define Y = X; + X)+...+X,. Then, Y-mp no = Normal(0, 1). 5. Bias of an estimator: Bias(,0) = E[6] — 4. 6. Method of moments: Sample moments, Mj(X;, Xo,..., X)= Le Xt i Ni=t Procedure: For one parameter @ e Sample moment: m, ¢ Distribution moment: E(X) = f(@) ¢ Solve for @ from f(@) = m, in terms of m. ob: replace m; by M, in the above solution. 7. Likelihood of i.i.d. samples: Likelihood of a sampling x, 22,..., 2n, denoted L(v1,---42n)=]] fx (i: 1,82, --) i=1 8. Maximum likelihood (ML) estimation: O;,63,... = arg max TT fx(2j;01,02,...) PO ca 9. Bayesian estimation: Let X),...,X, ~ i.i.d.X, parameter 9. Prior distribution of 9 : 0 ~ fo(4). Samples, S : (X; = 21,...,X, = 2) Posterior: 9 | (X, = 21,...,Xp = 2p) Bayes’ rule: Posterior oc Prior x Likelihood Posterior density « fa(#) x P(X; =a11,...,Xn =an | 9 =6) 10. Normal samples with unknown mean and known variance: 2 Sie X,, ~ iid. Normal(M, 0). Prior M ~ Normal (tip, 03). a ea Posterior mean: ji = X a + Ho (a) nop +0? no? +0? 11. Hypothesis Testing e Test for mean Case (1): When population variance o? is known (z-test) Test Ho Ha Test statistic | Rejection region T=xK right-tailed | jo = pio | pp > flo pe Sa X>e ~_ gi TX left-tailed | pp = po | p< po ge X — po X<e _ vi Tae two-tailed | = po | p # po z= X- [X — pig] > __ ya Case (2): When population variance o? is unknown (t-test) Test yeh Hy Test statistic | Rejection region T=X% right-tailed | js = pig | @ > flo . X-p X>c cot Sie T=% left-tailed | = po | 1 < po X-p X<e & T= two-tailed | = uo | 1 # Ho ' X= | X-pml>e aT i ¢ \*-test for variance: Test Hy Ha Test statistic Rejection region _1)92 right-tailed | o =o) | 0 > oy | T= fn a ea Soe 0 22 lefttailed | o =a) 0<o | T=" a nyt <2 fl a _1)g2 S? > c where — = P(S? > c*) or two-tailed | ¢=09 | o #09 ri ) wx! 3 % S? < where a P(S? <¢’) ¢ Two samples 2-test for means: Test ih Hy Test statistic Rejection region T=X-Y ye Tight-tlled | yx = po | pu > po X-Yan Norma. +) if Hy is true X-Y>e 1M T=Y-X i _ Vet-talled | Ha | th < th Y—X~ Nona 2.2) if Hp is true Y-X>e mm T=X-Y sem _ twortalled yu = pa | pn # on X-Yx Namal +) if Ho is true X-Y|>e 1%
Source diagram or notation
6406536957301.
Useful Data has been mentioned above.
6406536957302.
This data attachment is just for a reference & not for an evaluation.

Published solution

This is a formula/reference card. It supplies probability distributions, estimation formulas and hypothesis-test statistics for later questions. Choose the form appropriate to the model: a sample mean has variance sigma squared divided by sample size, a two-sample difference includes both variances, and significance is calculated under the null hypothesis. The administrative card itself does not require a statistical computation. **Answer: A.** A: **Correct:** Acknowledges that the useful reference information is supplied. B: **Incorrect:** This also describes its reference purpose, but the source selects the first acknowledgement.

Report a correction for Q2

Question 3 NAT · 3.0 marks

Let
Source diagram or notation
. The prior distribution of
Source diagram or notation
has the following PMF:
Source diagram or notation
Consider the samples S: {
Source diagram or notation
}. Find the posterior probability
Source diagram or notation
using Bayes' theorem. Enter the answer correct to two decimal places.

Published solution

The sample 1,1,0,1 has three successes and one failure, with likelihood p³(1-p). The prior-weighted likelihood at p=0.8 is 0.6×0.8³×0.2=0.06144; at p=0.2 it is 0.4×0.2³×0.8=0.00256. Bayes' rule gives \[P(P=0.8\mid S)=\frac{0.06144}{0.06144+0.00256}=0.96.\] Use both candidates in the denominator and distinguish the random parameter P from a probability notation P(event). **Answer: 0.96.**

Report a correction for Q3

Question 4 NAT · 3.0 marks

Let
Source diagram or notation
be a sample from a normal distribution having a variance of 25. We wish to test the hypothesis
Source diagram or notation
against
Source diagram or notation
. Consider a test that rejects
Source diagram or notation
for
Source diagram or notation
, where
Source diagram or notation
is the sample mean. Find the value of
Source diagram or notation
at a significance level
Source diagram or notation
. Enter the answer correct to two decimal places.

Published solution

Under H0:mu=0, Xbar is normal with standard deviation sqrt(25/100)=0.5. Significance 0.05 for rejection Xbar>c requires P(Z>c/0.5)=0.05. Using the supplied 95th percentile 1.645 gives c=0.5×1.645=0.8225, rounding to 0.82. The alternative mean 1.5 affects power, not this null-calibrated threshold. **Answer: 0.82.**

Report a correction for Q4

Question 5 NAT · 3.0 marks

The time (in minutes) passengers spend in the airport security line during a quiet period follows a continuous uniform distribution
Source diagram or notation
. The waiting times (in minutes) from a random sample of 5 passengers are as follows:
Source diagram or notation
Find the method of moments estimate of
Source diagram or notation
.

Published solution

For Uniform[4,theta], E[X]=(4+theta)/2. The observed sample mean is (4+6+7+5+8)/5=30/5=6. Equate the population mean to this sample moment: (4+theta)/2=6, so theta=8. This is a method-of-moments estimate; here it also equals the largest observation, but that equality is not the general derivation. **Answer: 8.**

Report a correction for Q5

Question 6 MSQ · 3.0 marks

Let
Source diagram or notation
be a discrete random variable with PMF as follows:
Source diagram or notation
Suppose
Source diagram or notation
i.i.d.
Source diagram or notation
. Define a new random variable
Source diagram or notation
. Which of the following option(s) is (are) true about the moment generating function of the random variable
Source diagram or notation
?
6406536957305.Source diagram or notation
6406536957306.Source diagram or notation
6406536957307.Source diagram or notation
6406536957308.Source diagram or notation
6406536957309.Source diagram or notation

Published solution

The individual MGF is \(M_X(t)=\tfrac15e^{-t}+\tfrac25+\tfrac25e^{2t}=(e^{-t}+2+2e^{2t})/5\). For the independent sum Y=X1+X2+X3, \(E[e^{tY}]=\prod_i E[e^{tX_i}]\). Therefore \(M_Y(t)=[(e^{-t}+2+2e^{2t})/5]^3\), and it is equivalently the product of the three individual MGFs. Sums of independent variables multiply their MGFs, rather than adding them. **Answer: B, C.** A: **Incorrect:** This is one variable's MGF, missing the cube for the sum of three. B: **Correct:** Cubes the common individual MGF correctly. C: **Correct:** The product identity follows from independence. D: **Incorrect:** Adds MGFs instead of multiplying them. E: **Incorrect:** Multiplying one MGF by 3 would give value 3 at t=0, but every MGF has M(0)=1.

Report a correction for Q6

Question 7 MSQ · 3.0 marks

Let
Source diagram or notation
be i.i.d. samples from
Source diagram or notation
and
Source diagram or notation
be i.i.d. samples from
Source diagram or notation
. The observed sample means are
Source diagram or notation
and
Source diagram or notation
. We wish to test the hypotheses:
Source diagram or notation
against
Source diagram or notation
. Consider a test that rejects
Source diagram or notation
if
Source diagram or notation
Let
Source diagram or notation
denote the significance level of the test and
Source diagram or notation
denote the cumulative distribution function (CDF) of the standard normal distribution. Express the critical value
Source diagram or notation
in terms of
Source diagram or notation
and
Source diagram or notation
. Select all the option(s) that apply.
6406536957310.Source diagram or notation
6406536957311.Source diagram or notation
6406536957312.Source diagram or notation
6406536957313.Source diagram or notation

Published solution

The independent sample-mean difference has null mean zero and variance 12/20+21/25=0.60+0.84=1.44, giving standard deviation 1.2. A two-sided test satisfies P(|Z|>c/1.2)=alpha, so \(c=1.2\Phi^{-1}(1-\alpha/2)\). Symmetry also gives \(c=-1.2\Phi^{-1}(\alpha/2)\). The observed means 52 and 49 determine the realised statistic, not the critical-value formula. **Answer: B, D.** A: **Incorrect:** Uses the lower alpha quantile without the required sign or two-tail split. B: **Correct:** Uses the correct upper 1-alpha/2 quantile. C: **Incorrect:** Uses the wrong tail level and a negative threshold for standard small alpha. D: **Correct:** Symmetry makes this the same positive threshold as B.

Report a correction for Q7

Question 8 MCQ · 2.0 marks

Let
Source diagram or notation
be a discrete random variable with probability mass function:
Source diagram or notation
Consider the random sample {1, 2, 1, 2}. Assume that the prior distribution of
Source diagram or notation
is uniform on
Source diagram or notation
Based on the above data, answer the given subquestions.
Which of the following is the correct likelihood function
Source diagram or notation
based on the given sample?
6406536957315.Source diagram or notation
6406536957316.Source diagram or notation
6406536957317.Source diagram or notation
6406536957318.Source diagram or notation

Published solution

Each observation is Binomial(3,theta). For the ordered sample 1,2,1,2, the binomial coefficients multiply to 3×3×3×3=81. Total successes are 6 and total trials are 4×3=12, leaving 6 failures. Thus L(theta)=81theta^6(1-theta)^6. A likelihood for exact observed values multiplies their individual probabilities. **Answer: D.** A: **Incorrect:** Has the wrong combinatorial constant and success/failure powers. B: **Incorrect:** Uses five success powers although the observed sum is six. C: **Incorrect:** Has the right powers but the wrong product of binomial coefficients. D: **Correct:** Uses coefficient 81 and six successes and six failures.

Report a correction for Q8

Question 9 NAT · 3.0 marks

Let
Source diagram or notation
be a discrete random variable with probability mass function:
Source diagram or notation
Consider the random sample {1, 2, 1, 2}. Assume that the prior distribution of
Source diagram or notation
is uniform on
Source diagram or notation
Based on the above data, answer the given subquestions.
Find the posterior mean of
Source diagram or notation
using the given prior distribution. Enter the answer correct to one decimal place.

Published solution

A uniform(0,1) prior is Beta(1,1). The likelihood contributes six success powers and six failure powers, so the posterior is Beta(7,7). Its mean is 7/(7+7)=0.5. Symmetry about one-half provides a check. The likelihood constant 81 cancels when the posterior is normalised. **Answer: 0.5.**

Report a correction for Q9

Question 10 NAT · 3.0 marks

Let
Source diagram or notation
be a discrete random variable with PMF as follows:
Source diagram or notation
Define another random variable
Source diagram or notation
. Based on the above data, answer the given subquestions.
What is the standard deviation of
Source diagram or notation
? Enter the answer correct to two decimal places.

Published solution

For X taking -1,0,1 with probabilities 1/4,1/2,1/4, E[X]=0 and E[X²]=1/2, so Var(X)=1/2. With Y=4X+2, Var(Y)=4²Var(X)=8 and SD(Y)=sqrt(8)≈2.828427. Round to 2.83. The additive constant shifts the mean but does not alter variance. **Answer: 2.83.**

Report a correction for Q10

Question 11 NAT · 2.0 marks

Let
Source diagram or notation
be a discrete random variable with PMF as follows:
Source diagram or notation
Define another random variable
Source diagram or notation
. Based on the above data, answer the given subquestions.
Find Cov
Source diagram or notation
.

Published solution

Cov(X,4X+2)=4Cov(X,X)+Cov(X,2)=4Var(X). A constant has zero covariance with X. Here E[X]=0 and E[X²]=1/2, giving Var(X)=1/2. Therefore Cov(X,Y)=4×1/2=2. **Answer: 2.**

Report a correction for Q11

Question 12 MCQ · 2.0 marks

The joint PDF of two random variables
Source diagram or notation
and
Source diagram or notation
is given by
Source diagram or notation
Based on the above data, answer the given subquestions.
Find the value of
Source diagram or notation
.
6406536957322.
3
6406536957323.Source diagram or notation
6406536957324.
6
6406536957325.Source diagram or notation

Published solution

The joint density is constant 1/k over the rectangle 1<=x<=2,0<=y<=3. Its area is (2-1)(3-0)=3. Total probability must be area times density=3/k=1, so k=3. This normalisation also gives density 1/3 on the rectangle. **Answer: A.** A: **Correct:** 3 makes the density integrate to 1. B: **Incorrect:** k=1/3 would produce total mass 9. C: **Incorrect:** k=6 would produce total mass 1/2. D: **Incorrect:** k=1/6 would produce total mass 18.

Report a correction for Q12

Question 13 NAT · 3.0 marks

The joint PDF of two random variables
Source diagram or notation
and
Source diagram or notation
is given by
Source diagram or notation
Based on the above data, answer the given subquestions.
Find the value of
Source diagram or notation
. Enter the answer correct to two decimal places.

Published solution

Normalisation gives k=3 and density 1/3 on the full rectangle. The event 1<X<1.5,0<Y<2 has area 0.5×2=1. Probability is area×density=1/3≈0.333333, rounding to 0.33. Because the distribution is continuous, endpoint inclusions do not change this result. **Answer: 0.33.**

Report a correction for Q13

Question 14 MCQ · 2.0 marks

A factory produces light bulbs. The manufacturer claims that the probability
Source diagram or notation
that a randomly selected bulb is defective is 0.1. Ravi suspects that the defect rate is actually higher than claimed. To test this, he randomly selects 10 bulbs from the production line. If two or more bulbs are found to be defective, he rejects the manufacturer's claim; otherwise, he accepts it. Based on the above data, answer the given subquestions.
Define the null hypothesis and the alternative hypothesis.
6406536957334.Source diagram or notation
6406536957335.Source diagram or notation
6406536957336.Source diagram or notation
6406536957337.Source diagram or notation

Published solution

The manufacturer's claim is p=0.1, and Ravi suspects an increase. Thus use H0:p=0.1 against HA:p>0.1. The alternative direction agrees with rejecting when the number of defective bulbs is unusually large. A two-sided alternative would instead test either an increase or a decrease. **Answer: B.** A: **Incorrect:** Tests any change rather than specifically a higher defect rate. B: **Correct:** Matches the claimed value and Ravi's direction of suspicion. C: **Incorrect:** Tests a lower rate, the opposite direction. D: **Incorrect:** Reverses the null claim and alternative structure.

Report a correction for Q14

Question 15 NAT · 3.0 marks

A factory produces light bulbs. The manufacturer claims that the probability
Source diagram or notation
that a randomly selected bulb is defective is 0.1. Ravi suspects that the defect rate is actually higher than claimed. To test this, he randomly selects 10 bulbs from the production line. If two or more bulbs are found to be defective, he rejects the manufacturer's claim; otherwise, he accepts it. Based on the above data, answer the given subquestions.
Find the significance level of the test. Enter the answer correct to three decimal places.

Published solution

Under H0, the defective count N is Binomial(10,0.1). The rule rejects for N>=2, so \[\alpha=P_{0.1}(N\ge2)=1-P(N=0)-P(N=1)=1-0.9^{10}-10(0.1)0.9^9\approx0.263901.\] Rounded to three decimals, enter 0.264. This is the probability of false rejection under the claimed defect rate, not the probability calculated under an unspecified alternative. **Answer: 0.264.**

Report a correction for Q15

Question 16 MCQ · 2.0 marks

Let
Source diagram or notation
be a random variable with mean
Source diagram or notation
and variance
Source diagram or notation
. Let
Source diagram or notation
and
Source diagram or notation
be the sample means of two independent random samples of sizes
Source diagram or notation
and
Source diagram or notation
, respectively, drawn from the distribution of
Source diagram or notation
. Consider the estimator
Source diagram or notation
where
Source diagram or notation
and
Source diagram or notation
are constants such that
Source diagram or notation
. Is
Source diagram or notation
an unbiased estimator of
Source diagram or notation
?
6406536957327.
Yes
6406536957328.
No

Published solution

Each sample mean has expectation mu. By linearity, E(aXbar1+bXbar2)=a mu+b mu=(a+b)mu=mu because a+b=1. Therefore the estimator is unbiased. Independence is relevant to its variance calculation but is not required for this expectation argument. **Answer: A.** A: **Correct:** The expectation equals the target mu. B: **Incorrect:** The weights summing to one eliminate bias under the common-mean assumption.

Report a correction for Q16

Question 17 NAT · 0.5 marks

Let
Source diagram or notation
be a random variable with mean
Source diagram or notation
and variance
Source diagram or notation
. Let
Source diagram or notation
and
Source diagram or notation
be the sample means of two independent random samples of sizes
Source diagram or notation
and
Source diagram or notation
, respectively, drawn from the distribution of
Source diagram or notation
. Consider the estimator
Source diagram or notation
where
Source diagram or notation
and
Source diagram or notation
are constants such that
Source diagram or notation
.
Source diagram or notation
Enter the correct option number for
Source diagram or notation
.

Published solution

Independence removes the covariance term, giving Var(mu-hat)=a²Var(Xbar1)+b²Var(Xbar2). Thus blank A is a², option 4. A coefficient scales variance by its square, not its first power. **Answer: 4.**

Report a correction for Q17

Question 18 NAT · 0.5 marks

Let
Source diagram or notation
be a random variable with mean
Source diagram or notation
and variance
Source diagram or notation
. Let
Source diagram or notation
and
Source diagram or notation
be the sample means of two independent random samples of sizes
Source diagram or notation
and
Source diagram or notation
, respectively, drawn from the distribution of
Source diagram or notation
. Consider the estimator
Source diagram or notation
where
Source diagram or notation
and
Source diagram or notation
are constants such that
Source diagram or notation
.
Source diagram or notation
Enter the correct option number for
Source diagram or notation
.

Published solution

The second sample mean's contribution is b²Var(Xbar2). Thus blank B is b², option 5. The samples are independent, so no additional cross-covariance term remains. **Answer: 5.**

Report a correction for Q18

Question 19 NAT · 0.5 marks

Let
Source diagram or notation
be a random variable with mean
Source diagram or notation
and variance
Source diagram or notation
. Let
Source diagram or notation
and
Source diagram or notation
be the sample means of two independent random samples of sizes
Source diagram or notation
and
Source diagram or notation
, respectively, drawn from the distribution of
Source diagram or notation
. Consider the estimator
Source diagram or notation
where
Source diagram or notation
and
Source diagram or notation
are constants such that
Source diagram or notation
.
Source diagram or notation
Enter the correct option number for
Source diagram or notation
.

Published solution

The first sample has n1 independent observations each with variance sigma², so Var(Xbar1)=sigma²/n1. This expression is option 2. Averaging divides the variance by n1, not n1 squared after the n1 summands have been added. **Answer: 2.**

Report a correction for Q19

Question 20 NAT · 0.5 marks

Let
Source diagram or notation
be a random variable with mean
Source diagram or notation
and variance
Source diagram or notation
. Let
Source diagram or notation
and
Source diagram or notation
be the sample means of two independent random samples of sizes
Source diagram or notation
and
Source diagram or notation
, respectively, drawn from the distribution of
Source diagram or notation
. Consider the estimator
Source diagram or notation
where
Source diagram or notation
and
Source diagram or notation
are constants such that
Source diagram or notation
.
Source diagram or notation
Enter the correct option number for
Source diagram or notation
.

Published solution

Substitute the two sample-mean variances and factor out sigma²: Var(mu-hat)=sigma²(a²/n1+b²/n2). Blank D is a²/n1, option 6. Keep the squared weight on the correct sample-size denominator. **Answer: 6.**

Report a correction for Q20

Question 21 NAT · 1.0 marks

Let
Source diagram or notation
be a random variable with mean
Source diagram or notation
and variance
Source diagram or notation
. Let
Source diagram or notation
and
Source diagram or notation
be the sample means of two independent random samples of sizes
Source diagram or notation
and
Source diagram or notation
, respectively, drawn from the distribution of
Source diagram or notation
. Consider the estimator
Source diagram or notation
where
Source diagram or notation
and
Source diagram or notation
are constants such that
Source diagram or notation
.
Source diagram or notation
Calculate the value for
Source diagram or notation
. Enter the answer correct to two decimal places.

Published solution

Given a=0.5 and a+b=1, b=0.5. With n1=n2=10 and sigma²=5, Var(mu-hat)=5(0.25/10+0.25/10)=5×0.05=0.25. Because this estimator is unbiased, this variance also equals its mean squared error for estimating mu. **Answer: 0.25.**