Question 106 MCQ · 2.0 marks

Match Col A with Col B for landmark outcome of industrial era [[IMAGE:3a18958a4e2ef05c_2_0]]
Source diagram or notation
  1. 1.0:CNC, 2.0:Mass production, 3.0: Digitization, 4.0:Steam Engine
  2. 1.0:Steam Engine, 2.0:mass production, 3.0: digitization, 4.0:CNC
  3. 1.0:Mass production, 2.0:Steam Engine, 3.0: digitization, 4.0:CNC
  4. 1.0:Steam Engine, 2.0:mass production, 3.0: CNC, 4.0: Digitization

A published solution is not available for this question yet.

Question 107 MCQ · 1.0 marks

Identify the Industry 4.0 version of transportation.
  1. IC engine
  2. Electric car
  3. Hyperloop

A published solution is not available for this question yet.

Question 108 MCQ · 1.0 marks

The Production rate of an assembly line is determined by its
  1. Slowest station
  2. Fastest station
  3. Idle station
  4. None of these

A published solution is not available for this question yet.

Question 109 MSQ · 1.5 marks

Select the layout(s) which require(s) general supervision:
  1. Product layout
  2. Process layout
  3. Group layout
  4. Fixed position layout

A published solution is not available for this question yet.

Question 110 MCQ · 1.5 marks

Select the appropriate layout for Quadrants A, B, D in the following figure: [[IMAGE:3a18958a4e2ef05c_5_1]]
Source diagram or notation
  1. A: Group layout, B: Product layout , D: Process layout
  2. A: Process layout, B: Group layout , D: Product layout
  3. A: Product layout, B: Process layout , D: Group layout

A published solution is not available for this question yet.

Question 111 MSQ · 1.0 marks

Which of the following is an advantage of Product Layout?
  1. Small in-process inventory
  2. It can accommodate high variety of products
  3. High utilization of machines
  4. Low investment

A published solution is not available for this question yet.

Question 112 MSQ · 2.0 marks

Select the correct statements from below:
  1. Optimal solution in a facility location problem using Euclidean method will result in a region
  2. Optimal solution in a facility location problem using Euclidean method rarely matches the center of gravity
  3. Optimal solution in a facility location problem using Euclidean method will result in a point
  4. Optimal solution in a facility location problem using Euclidean method matches the center of gravity in not of the cases

A published solution is not available for this question yet.

Question 113 MSQ · 2.0 marks

Identify the examples for Offshoring from the list below:
  1. Shell, an oil company based in Netherlands, setting up a data science team in India.
  2. Western Australia’s electricity network agency assigns Tata Consultancy Services at Pune, to support it with an overhaul of its legacy IT systems, aimed at delivering cheaper and more reliable power.
  3. Target Corporation, a retail giant based in US, setting up Supply Chain Optimization team at Bengaluru.
  4. Tata Motors assigns the manufacturing of its braking system to TACO group.

A published solution is not available for this question yet.

Question 114 NAT · 1.0 marks

A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. Answer the given subquestions:
What is the cycle time (in seconds) at any workstations (round your answer to one decimal).

    A published solution is not available for this question yet.

    Question 115 NAT · 1.0 marks

    A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. Answer the given subquestions:
    What is the theoretical minimum number of workstations required?

      A published solution is not available for this question yet.

      Question 116 NAT · 1.0 marks

      Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute. [[IMAGE:3a18958a4e2ef05c_9_2]] Based on the above data, answer the given subquestions.
      What is the minimum cycle time of the system (in minute)?
      Source diagram or notation

        A published solution is not available for this question yet.

        Question 117 NAT · 1.0 marks

        Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute. [[IMAGE:3a18958a4e2ef05c_9_2]] Based on the above data, answer the given subquestions.
        What is the maximum cycle time of the system (in minute)?
        Source diagram or notation

          A published solution is not available for this question yet.

          Question 118 MCQ · 1.0 marks

          Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute. [[IMAGE:3a18958a4e2ef05c_9_2]] Based on the above data, answer the given subquestions.
          The factory works for one 8-hour shifts each day. Is it possible to achieve an output of 32 units/day,
          Source diagram or notation
          1. Yes
          2. No

          A published solution is not available for this question yet.

          Question 119 NAT · 2.0 marks

          Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute. [[IMAGE:3a18958a4e2ef05c_9_2]] Based on the above data, answer the given subquestions.
          What is the balance delay of the following layout (round it to two decimals) (1,2) -> (3) -> (4) -> (5) -> (6,7) -> (8,9) -> (10,11,12)
          Source diagram or notation

            A published solution is not available for this question yet.

            Question 120 NAT · 1.0 marks

            Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute. [[IMAGE:3a18958a4e2ef05c_9_2]] Based on the above data, answer the given subquestions.
            What is the efficiency of the given layout? Round off to two decimals without percentage sign
            Source diagram or notation

              A published solution is not available for this question yet.